New Distribution Box installed. New Header Pipes connect to the lateral Drainfield Lines.
Cleaning the Distribution Box.
Effluent Filter installed. All Star recommends cleaning this filter every 6 months.
Placing the Effluent Filter into the Filter Basket.
Effluent Filter ready to install in Septic Tank.
Newly installed Zoeller Pump in Pump Chamber.
Inner cavity of Pump Tank with 3 new Float Switches (on right) and new Zoeller Effluent Pump.
Replacing the Pump and Float Switches in the Pump Chamber.
Once backfilled, the manhole cover is all that is exposed to the surface.