-->
New Distribution Box installed. New Header Pipes connect to the lateral Drainfield Lines.
Cleaning the Distribution Box.
Effluent Filter installed. All Star recommends cleaning this filter every 6 months.
Placing the Effluent Filter into the Filter Basket.
Effluent Filter ready to install in Septic Tank.
Newly installed Zoeller Pump in Pump Chamber.
Inner cavity of Pump Tank with 3 new Float Switches (on right) and new Zoeller Effluent Pump.
Replacing the Pump and Float Switches in the Pump Chamber.