New Distribution Box installed. New Header Pipes connect to the lateral Drainfield Lines.
Cleaning the Distribution Box.
Effluent Filter installed. All Star recommends cleaning this filter every 6 months.
Placing the Effluent Filter into the Filter Basket.
Effluent Filter ready to install in Septic Tank.
Newly installed Zoeller Pump in Pump Chamber.
Inner cavity of Pump Tank with 3 new Float Switches (on right) and new Zoeller Effluent Pump.
Replacing the Pump and Float Switches in the Pump Chamber.
Once backfilled, the manhole cover is all that is exposed to the surface.
Rizer and Manhole Cover prior to backfill.
New installation, Septic Tank in foreground supported by Pump Chamber.
Newly installed Stub-Tee on inlet side of Septic Tank. The ‘Tee' configuration helps to prohibit foreign material from backing into sewer line and dwelling.